RB-99-02: INDOEX Cruise Leg 2
Plan of the Day: 27 March, 1999
0000 Filter change
0345 Radiosonde launch (for 0000Z).
0600 Filter change (tower and vans)
0700 Ozonesonde launch
0945 Radiosonde launch (for 0600Z).
1030 CTD/Optical cast station ops
- Free Falling Profiler (hand-deployed)
- CTD to 150m
- RADS drifter (hand deployed)
- Plankton net (hand-deployed)
- Optical cast to 300m
1200 Tower ops / filter change, Ozonesonde launch
1545 Radiosonde launch (for 1200Z)
1830 Ozonesonde launch
2145 Radiosonde launch (for 1800Z)
NOTES :
- Bridge watches: Notify Bremen Group (day or night) if high winds and heavy rainfall is anticipated, or occurs, at the ship: Lars Reichart or Jorn Burkert (AOML Van or S/R 2-31-2)
Also notify Michael Norman or Lennart Granat it prolonged rainfall is expected.
- INDOEX web page access on ship:
http://205.156.17.42
Access to tower and bow area forward of 0-2 vans remains restricted
inform AL van if access is required. Please keep traffic on 0-2 van deck to a minimum.