RB-99-02: INDOEX Cruise Leg 2

Plan of the Day: 5 March, 1999



0000 – Filter change

0345 – Radiosonde launch (for 0000Z).

0600 – Filter change (tower and vans)

1200 – Optical cast/CTD station ops

(SeaWifs satellite pass - 1243L; AVHRR – 1427L)

    1. Optical cast to 300m
    2. CTD w/ bottle samples at 0m, 10m, 30m, 100m, 150m, 300m.
    3. Plankton net (hand-deployed)
    4. Free Falling Profiler (hand-deployed)
1200 – Tower ops / filter change

1300 – Ozonesonde launch

1545 – Radiosonde launch (for 1200Z)

1800 – Tower ops / filter change

1830 – Depart Kashidhoo Station

2145 – Radiosonde launch (for 1800Z)

NOTES :

  1. Bridge watches: Notify Bremen Group (day or night) if high winds and heavy rainfall is anticipated, or occurs, at the ship: Lars Reichart or Jorn Burkert (AOML Van or S/R 2-31-2)
  2. INDOEX web page access on ship: http://205.156.17.42
  3. Access to tower and bow area forward of 0-2 vans remains restricted… inform AL van if access is required. Please keep traffic on 0-2 van deck to a minimum.