RB-99-02: INDOEX Cruise Leg 2
Plan of the Day: 5 March, 1999
0000 Filter change
0345 Radiosonde launch (for 0000Z).
0600 Filter change (tower and vans)
1200 Optical cast/CTD station ops
(SeaWifs satellite pass - 1243L; AVHRR 1427L)
-
Optical cast to 300m
-
CTD w/ bottle samples at 0m, 10m, 30m, 100m, 150m, 300m.
-
Plankton net (hand-deployed)
-
Free Falling Profiler (hand-deployed)
1200 Tower ops / filter change
1300 Ozonesonde launch
1545 Radiosonde launch (for 1200Z)
1800 Tower ops / filter change
1830 Depart Kashidhoo Station
2145 Radiosonde launch (for 1800Z)
NOTES :
-
Bridge watches: Notify Bremen Group (day or night) if high
winds and heavy rainfall is anticipated, or occurs, at the ship: Lars Reichart
or Jorn Burkert (AOML Van or S/R 2-31-2)
-
INDOEX web page access on ship: http://205.156.17.42
-
Access to tower and bow area forward of 0-2 vans remains
restricted
inform AL van if access is required. Please keep traffic on
0-2 van deck to a minimum.