RB-99-01: ACE Cruise Leg 1
Plan of the Day: 25 January, 1999
0600 – Filter change (tower and vans)
0900 – Radiosonde launch
0930 – Ozonesonde launch
1130 – CTD/Optical cast station ops (clouds permitting)
(SeaWifs satellite pass: 1215L)
1215 – Instrument maintenance
1300 – Quick filter change
1800 – Filter change (tower and vans)
1930 – Meeting of CARD-CARRYING SHELLBACKS in the ship’s lounge.
(spying POLLYWOGS will be dealt with harshly!)
2000 – Met discussion in ship’s library
2100 – Radiosonde launch
2400 – Quick filter change
Notes: